Westchester University
Draft Environmental Impact Statement
September 2007
Accepted by the Planning Board: September 17, 2007
VOLUME I
Table of Contents
Title
Consultants
Agencies
Contents
Tables/Exhibits
Figures/Plates
Appendices
A. Proposed Action
B. Alternatives
C. Potential Significant Adverse Impacts and Mitigation
II. Proposed Action/Project Description
A. Proposed Action Overview
B. Background, History of the Proposed Action; Purpose and Benefits
C. Detailed Description of Proposed Action/Programmatic Characteristics
D. Site Preparation and Infrastructure
III. Existing Environmental Setting, Project Proposals/Impacts and Mitigation Measures
A. Land Use, Neighborhood and Public Policy
a&b. Land Use Study Area and Land Uses
c. Zoning
d. Land Use Study Area Town and County Planning Studies
e. Other Major Developments in the Land Use Study Area
f. Future Land Use, Zoning and Neighborhood Character without the Proposed Action
g. Project Proposals/Impacts of Proposed Action
h. FAA Height Regulations
i. Mitigation Measures- FIGURE III/A-1 DETAILED EXISTING LAND USE
- FIGURE III/A-2 GENERALIZED EXISITNG LAND USE
- FIGURE III/A-3 EXISTING ZONING
- EXISTING DEVELOPMENT (PLATES)a. Proposed Architectural Example
b. Visual Impact Analysis
c. Visual Relationships
d. Mitigation Measures- FIGURE III/B-1 PRELIMINARY ARCHITECTURAL EXAMPLE
- FIGURE III/B-2 SITE SECTION KEY PLAN
- FIGURE III/B-3 PROPOSED SITE SECTIONS
- FIGURES III/B-4 - B-24 VISUAL IMPACT ASSESSMENTa. Existing Condition
b. Potential Impact of Proposed Project
c. Mitigation MeasuresD. Environmental Site Assessment
a. Existing Conditions
b. Potential Impact of Proposed Project
c. Mitigation MeasuresE. Traffic and Transportation
a. Introduction
b. Existing Conditions
c. Future Conditions
d. Capacity Analysis
e. Assessment of Intersection Operations
f. Public Transportation
g. Pedestrian Circulation
h. Parking
i. Emergency Access and On-Site Circulation
j. Westchester County Emergency Evacuation Plan (Indian Point)F. Air Quality
a. Existing Conditions
b. Project Proposal/Impacts
c. Mitigation MeasuresG. Noise
a. Existing Conditions
b. Project Proposal/Impacts
c. Mitigation Measuresa. Demographic Data and Trends
b. Socio-Economic Impact and Project Impact on Surrounding Businesses and Westchester County
c. Estimated Sales Tax Revenue to be Generated
d. Number and Type of Jobs Generated by Proposed Action
e. Construction Stage Economic Impacts
f. Fiscal Impact of Westchester University Real Property Tax Exemption
g. Mitigation MeasuresI. Infrastructure, Energy and Community Services
a. Water Distribution System
1. Existing Water Distribution System
2. Project Proposal/Impacts
3. Mitigation Measuresb. Sanitary Sewer System
1. Existing Conditions
2. Project Proposal/Impacts
3. Mitigation Measuresc. Stormwater Management
1. Existing Conditions
2. Project Proposal/Impacts and Mitigation Measuresd. Solid Waste
1. Existing Condition
2. Project Proposals/Impacts
3. Mitigation Measurese. Gas, Electric and Other Utilities
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresf. Police
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresg. Fire
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresh. EMS
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresi. Schools
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresj. Library
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresk. Recreation
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresl. Fiscal Impacts
a. Geology
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresb. Topography and Slope
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresc. Soils
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresd. Surface Water Resources
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measurese. Groundwater Resources
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresf. Stormwater Management
g. Wetlands
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresh. Vegetation
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measuresi. Wildlife and Habitats
1. Existing Condition
2. Project Proposal/Impacts
3. Mitigation Measures
IV. Construction Impacts and Mitigation Measures
A. Construction Schedule
B. Construction Activities
a. Construction Timing
b. Construction Operations
c. Excavation Blasting
d. Ingress/Egress/Internal CirculationC. Mitigation Measures
V. Unavoidable Adverse Environmental Impacts Which Cannot Be Mitigated
VI. Irreversible and Irretrievable Commitment of Resources
VIII. Use and Conservation of Energy
IX. Alternative to the Proposed Action
A. No Action Alternative
B. Development of the Project for Offices Under the OB-1, Existing Zoning
C. Master Plan Submitted to Town, May 23, 2003
D. Alternative Sites
VOLUME 2 - APPENDICES
Appendix 1 Scoping Document and Long Environmental Assessment Form (EAF)
Exhibit 1 Figures/Plates
Exhibit 2 Traffic Impact Study
Exhibit 3 Stormwater and Engineering Report
Exhibit 4 Archaelological/Historical Report
Exhibit 5 Wetlands Report
Appendix 2 Traffic Report Appendices (includes Traffic Appendices A, B, C and D)
Appendix 5 Stormwater Pollution Prevention Plan
Appendix 6 Wetlands and Biological Assessment Report
Appendix 10 Archaeological/Historical Report
Appendix 11 Phase I Environmental Assessment Report
Appendix 12 Survey of Existing Columbus Avenue Sanitary Sewer
Appendix 13 University Economic Impact Studies
Appendix 14 Town Comments on Westchester University DEIS dated May 2006
VOLUME 3 - APPENDICES
Appendix 5 Stormwater Pollution Prevention Plan
Letter to Planning Board Isolating Westchester University Impacts